Low Level Design and Utility “Make Ready” Work

August 15, 2022/in /by rappbroadband-admin

The first phase of the project will be focused on Low Level Design and the pole attachment make-ready process. Several months’ worth of designed and permitted fiber miles will need to be released from Low Level Design prior to fiber construction commencing.

View a summary map of the Low Level Design.

/wp-content/uploads/2021/10/RappahannockCountySeal-1-296x300.png 0 0 rappbroadband-admin /wp-content/uploads/2021/10/RappahannockCountySeal-1-296x300.png rappbroadband-admin2022-08-15 10:50:492024-06-05 12:07:05Low Level Design and Utility “Make Ready” Work

Latest News

Follow a manual added link
Follow a manual added link
Follow a manual added link
Follow a manual added link
Follow a manual added link

© Copyright – Rappahannock County Broadband Authority.  All rights reserved.

Final Agreements Executed for the Regional Project Construction Planning
Scroll to top

Subscribe to the Rappahannock Broadband Authority Newsletter